
A representative sample of recent builds across Klang Valley and Putrajaya. Each project below was managed by an in-house Tracenex foreman from drawings to handover.






Full hack-and-rebuild of a 22-foot intermediate terrace in Bangsar Baru. Wet kitchen extension, internal hack, rewiring and three full-height tiling washrooms. Delivered in 9 weeks against a 10-week target.
Open-plan tech office in Cyberjaya, 4,200 sq ft. Acoustic ceiling, raised floor for cabling, focus pods and a barista counter. Tenant moved in two weeks ahead of lease commencement.
Replacement of a 17-year-old kitchen in Presint 11 with quartz countertops, soft-close carpentry, induction hob, range hood and tiled splashback. Total project: 5 weeks.
Full rebuild of a 60 sq ft master bathroom in a strata condo. Required JMB approval for floor hacking, two-coat waterproofing, walk-in shower with linear drain and timber-look porcelain tile.
2,000 sq ft fit-out for a single-chair-to-three-chair upgrade. Required compressed air piping, X-ray room shielding, autoclave drainage and patient flow redesign. Built in 6 weeks of evening shifts.
Tear-down of internal partitions, new master suite extension, full M&E rework and roof-deck addition. Phased over 14 weeks with the owners living on the ground floor throughout.
We can often arrange a site visit to a recently completed home with the owner's permission — usually within ten minutes' drive of Putrajaya or Cyberjaya.