The two rooms that work hardest. We rebuild them with custom carpentry, real stone countertops, full-height tiling and ventilation you can actually live with.

Most of our kitchen clients want three things: more counter space, less greasy walls, and a layout that works for the way Malaysian families actually cook. Our remodel scope is built to deliver those.
A typical wet kitchen rebuild takes 4β6 weeks. A combined dry+wet kitchen with island can run 6β8 weeks depending on stone lead times.
Bathrooms fail when waterproofing is rushed. We refuse to rush waterproofing. Every wet area receives a two-coat polyurethane membrane, a 24-hour flood test before tiling, and a signed certificate at handover.
A single bathroom rebuild typically takes 3β5 weeks including waterproofing cure and stone fabrication.

Engineered quartz from established Malaysian suppliers β non-porous, heat resistant, no resealing needed.
Blum or HΓ€fele hinges and drawer slides as standard. The mid-range Chinese brands fail at the eighteen-month mark.
Two-coat polyurethane membrane on all wet areas, applied at consistent thickness and flood-tested before tiling.
Kitchen exhaust ducted to external wall β not just a recirculating filter. Bathrooms get high-CFM extraction fans with timer.
We will measure, photograph and discuss layout options on-site at no charge. You receive a written indicative band within five working days.